반응형

butt joint 

 butt는 중간사이에 이렇게 칼집을 넣어준다,

 

When dealing with drywall butt joints, cutting or "back-cutting" the edges of the sheets slightly with a knife can help create a better joint that is easier to finish. This technique removes a small amount of the drywall's front-facing gypsum along the edge, allowing it to recess slightly. This creates a slight depression that makes it easier to apply joint compound and embed the tape without creating a visible bulge, resulting in a smoother, more seamless finish.

 

matt tape은 주로 이런 작은 패치등 에쓰고, 주로 paper taper을쓴다,

befor tape

pre fil

 

Pre-filling with joint compound, or "pre-fill mud," before applying tape to drywall is essential for achieving a strong, smooth finish in areas where there are gaps, uneven surfaces, or imperfections in the drywall seams. Here's why it's done:

1. **Fills Gaps and Voids**: Pre-filling helps fill any large gaps or spaces between drywall sheets, especially around butt joints or in areas where the drywall doesn’t fit perfectly. This ensures there is a solid base before the tape is applied.

2. **Provides a Smooth Surface**: It levels out uneven areas, making sure that when the tape is applied, there are no air pockets or bubbles that could lead to cracks or a weak bond.

3. **Increases Bond Strength**: By filling gaps with mud first, the tape adheres better to the surface, providing a stronger joint. The pre-fill ensures the tape is firmly embedded in the compound, leading to fewer issues with cracking or detachment later.

4. **Reduces Shrinking Issues**: Pre-filling reduces the amount of compound required later, lowering the chance of shrinkage cracks as the mud dries, particularly when large gaps or seams need more material.

In summary, pre-filling before taping ensures a more durable, long-lasting joint and a smoother, more professional finish.

embed tape 

mud first wall

mud ceiling

fold tape

 

than tape 

down first 

코너는 테이프가 겹침, 

 

손으로 눌러서 밀착시켜준다 

드라이월 스크루는 조금더 들어가게 박어야한다 아니면 턱턱 걸리고 숨킬수가없다,  머드로 덧칠한다,

반응형

'Project Manager work task' 카테고리의 다른 글

How To Install Baseboard - angle  (0) 2024.10.25
mud method 1,2,3 and sanding  (1) 2024.10.25
dry wall fix step  (1) 2024.10.24
House construction process  (0) 2024.10.21
Construction Cost Estimating and Management  (0) 2024.10.20