Project Manager work task

practice - wind roof

철학가 2024. 9. 29. 07:11
반응형

 

 

actually 9.7 is week so we need to check,

 

 

date discovery time and date of loss time is different,

 

 

where you reach freezing temp, requires the ice and water shild be installed 24inchs in from exterior wall lining,

 

 

 

photo, whatever direction, does not matter clockwise or counter,

but need to be same photo updated and exstimate   like sequence,

 

even it is wind claim, but if there is hail,  take it picture,

 

 

Blistering is often due to poor installation, low-quality materials, or prolonged exposure to heat. In contrast, hail damage is caused by the impact of hailstones during a hailstorm. The underlying causes of these issues are different, requiring different approaches to prevention and repair

 

 

 

 

this is not water damage,,

 

반응형

'Project Manager work task' 카테고리의 다른 글

1 Main Street - Photo & Scope - theif  (0) 2024.10.01
15 Inglewood water damage photo  (0) 2024.09.30
floor plan drawing how to  (0) 2024.09.27
pracitce - smoke(guid lines)  (3) 2024.09.27
equipment formular  (1) 2024.09.25